Possible combinations

The ER flush-mounted exhaust air systems described here comprise a flush-mounted housing and a fan insert/exhaust air element with cover.

In the shell construction phase the ER-UP housing (ER-UP/G, ER-UPD and ER-UPB) are installed, wired and provided with a plaster protective cover.

ER-UP/G and ER-UPD housings can be used with a second room connection set (ER-ZR) for second room ventilation. Ensure the right housing variant (ER-UPB/L, ER-UPB/R or ER-UPB/U) for ER-UPB housings.

Toilet seat air extraction at the same time as room ventilation is possible using the second room connection of the ER-UP/G or ER-UPD housings. The Maico extraction socket ER-AS (DN 70) should be used for this purpose and a connection established to the WC seat.

Final assembly is undertaken once the plastering and paint work is complete.

For decentralised ventilation, an ER 60 or ER 100 fan insert is placed in the flush-mounted housing, the exhaust air filter and cover are fitted.

For centralised ventilation, a Centro M / E / H exhaust air element is installed with an exhaust air filter and cover separate Centro operating instructions.

ER 100 units are approved for second room ventilation. The following control types can be used for this: Standard, VZ, VZ 15, VZC, G, I, D or RC. Centralised ventilation with Centro-M / E / H exhaust air elements is possible in combination with ER-UP/G housings under certain preconditions (Installing ER-UP/G housing).

ER 60 units are not permitted for the second room connection.

For ER radio fans and Maico smart, see 100 RC instructions.